Submissions drawn with our architects
Structural and addition and alteration submissions are prepared with GK Architects, so approvals move in step with the build programme instead of holding it up.
Selected stills
Ground-up rebuilds and structural works, delivered alongside GK Architects.
Landed Construction
Reconstruction, structural additions and full rebuilds, delivered with GK Architects. Structure, waterproofing and the finishing trades sit inside a single contract, so no one can point at the trade before them.

Highland Road

Elite Park

Farleigh Avenue
Structural and addition and alteration submissions are prepared with GK Architects, so approvals move in step with the build programme instead of holding it up.
Reinforcement, screeds and waterproofing are checked and recorded while they are still open, because these are the only works nobody can revisit once the tiles go down.
The team that runs the structural works carries the job through carpentry and painting, which is why the last ten per cent does not drag the way it does on split contracts.

Influencer Houses · Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction

Landed Construction · Landed Property

Landed Construction

Landed Construction · Landed Property

Landed Construction

Landed Construction

Landed Construction
Ask us
Structural and addition and alteration submissions are prepared with GK Architects, so approvals move in step with the build programme instead of holding it up.
One. Structure, waterproofing and the finishing trades sit inside a single contract, so no one can point at the trade before them.
We hold a Class 2 General Builder licence.
Reinforcement, screeds and waterproofing are checked and recorded while they are still open, because these are the only works nobody can revisit once the tiles go down.
The team that runs the structural works carries the job through carpentry and painting, which is why the last ten per cent does not drag the way it does on split contracts.